Nevskaya Ratusha administrative and public center with underground parking, Saint-Petersburg, Russia with the total area of 100 736 sq m

  • The installation of aluminium façade with glass infill and thermal insulation is running on the 4 courtyard areas of Administrative building; installation of the TV-studio steel frame is going ahead; the rest support steel elements of the Terrace and the Dome structure are currently under supply; the installation of unitized façade with natural stone is getting commenced on 3-8 floors.
  • On Business Centre-2 the mullion-transom aluminium system with glass infill and shadow boxes has been completed in full on the courtyard area; aluminium framework and glazing of the skylight structure have been installed; the fixing of brackets and aluminium for courtyard panoramic lifts is under start-up.
  • On the facades of Business Center-2 and Business Center-3 all scope of wall brackets and rock wool insulation for ventilated façade with natural stone has been fixed; the wall brackets for ventilated façade are under installation on the maintenance roof floor.
  • On Business Center-3 the aluminium mullion-transom façade has been installed on the area of the first and second floor and is currently being glazed.

Multifunctional residential area with Trud stadium restore on Mytnaya Str, Moscow with the total area of 61 000 sq m

  • On the high-rises the installation of shadow-boxes is in process as well as the glass infill on the balcony area;
  • On the building 4 the fixing of cantilevers and rail tracks for BMU is currently carried out on the roof;
  • The installation of the mullion-transom system is currently under completion on the balcony area of buildings 1 and 2;
  • On the buildings 3 and 4 the glass infill on the balconies has been installed in full scope, opaque glass is being mounted on the building 3 and the installation of ventilated facade wall brackets is going ahead on the building 4;
  • The installation of mullion-transom façade with glass infill and fire proof spandrel panels is running on the building 6.

Eurasia Tower, plot 12 of the Moscow-City MIBC, Moscow, Russia to the total area of 74 000 sq m

  • The installation of unitized transparent façade is under commencement on the top residential area of the tower; the glazing of temporary service access areas is getting completed;
  • On the Podium the geodesic survey and design works are currently going ahead.

Nevskaya Ratusha administrative and public center with underground parking, Saint-Petersburg, Russia with the total area of 100 736 sq m


Multifunctional residential area with Trud stadium restore on Mytnaya Str, Moscow with the total area of 61 000 sq m


Eurasia Tower, plot 12 of the Moscow-City MIBC, Moscow, Russia to the total area of 74 000 sq m